Long Lead Pipe
Long Lead Pipe
Long Lead Pipe
Epic Armoury

Long Lead Pipe

A5597

Regular price $180.00 Save $-180.00
Pre-order
Shipping Time: 4 to 12 weeks

The shipping time estimate includes the production and delivery times to a local or international destination. The unavailability of certain partner products is possible. Do not hesitate to contact us to inquire about shipping time for specific articles.

*Keep in mind this item is only available in Pre-Order. It will have to be produced or ordered before it can be shipped.

Description

Life in a post-apocalyptic hellscape isn't easy whether you're a human survivor or a ravenous mutant in search of fresh meat. This long lead pipe is the heavy bludgeon you need to get out of trouble or knock your next prey into its last sleep. Made of foam, this realistic reproduction makes for an amazing improvised weapon that is both versatile and durable in combat. It's the perfect weapon for LARP survivors, wasteland warriors, mutants, and street thugs. It's massive reach is comparable to a dystopian version of a quarterstaff or polearm. 

Characteristics

  • Length: 190cm (75 in)
  • Fiberglass core
  • Latex

Made in India by Epic Armoury